This project is constructing a 30-mile long flood diversion channel that is designed to protect Moorhead, Fargo and West Fargo from flooding for 100 years.
S&B USA is part of Bridging Pennsylvania Developers (BPD), a group that formed as a response to the PennDOT Pathways Program, which is rapidly addressing the state's growing backlog of rehabilitation needs for major bridges that are approaching the end of their lifespan.
Fay is in the design phase of a progressive design-build project that will increase the clearance of the Howard Street Tunnel from 19 to 21 feet to permit the safe passage of double-stack trains.
This public-private partnership (P3) constructed four tolled express lanes on SH 288 in Houston, TX to relieve congestion along Houston's third most-congested roadway, accommodating daily traffic volumes of 150,000 to 170,000 vehicles.