In The News

Demolition

The Big Push! Commercial Street Bridge Project Slides Into Home This Summer With Local Expertise

The Big Push! Commercial Street Bridge Project Slides Into Home This Summer With Local Expertise

The TEQ Summer Issue spotlights Fay, S&B USA Construction and the precision behind this summer's I-376 Commercial Street Bridge slide, featuring insights from Project Manager Michelle Olszewski and PennDOT District 11 Executive Jason Zang.

Read more

Fay, S&B USA Construction Recognized with 2nd Place Award for Safety Excellence by AGC

Fay, S&B USA Construction Recognized with 2nd Place Award for Safety Excellence by AGC

Fay wins 2nd Place at AGC Safety Award

Read more

Fay, S&B USA Construction Awarded PennDOT Contract for the Layton Bridge Replacement Project

Fay, S&B USA Construction Awarded PennDOT Contract for the Layton Bridge Replacement Project

Fay, S&B USA Construction awarded Contract for the Layton Bridge Replacement Project by PennDOT

Read more

Fay Razes Monongahela Lock and Dam No. 3

Fay Razes Monongahela Lock and Dam No. 3

This project involves the demolition of existing structures, the establishment of a new navigable channel, and the stabilization of the monoliths that will remain after construction. The economic benefit of creating a new navigable channel is expected to be $200 million annually.

Read more

Joseph B. Fay wins $30M Monongahela River locks, dam contract

Joseph B. Fay wins $30M Monongahela River locks, dam contract

We've been awarded a $30 million contract by the U.S. Army Corps of Engineers to remove the historic Monongahela River Locks and Dam 3 in Elizabeth. This project is a crucial part of the Lower Monongahela River reconstruction, creating 30 miles of unimpeded navigable waterways.

Read more